Description of goods: equipment, materials, equipment for cement plants
Port of discharge: Nigeria APAPA
Shipment volume: 250,000 square meters, transportation period: 12 months
Destination: IBESE, Ogun State, Nigeria
Mode of transport: car transport, barge transport
The large parts include kiln cylinder, wheel belt, vertical mill reducer, etc. The most heavy parts are 144 tons.
Loading barges, professional large-scale operation team, integrated barges, berths, and axis vehicles to provide an efficient and safe transportation plan
Self-owned fleet guarantees transportation effect and transportation safety